About

The data centre industry is undergoing a structural shift

Access to power, land and connectivity, not capital alone, now determines who can build, and when.

DDSP was built to navigate that shift. Founded in 2022 and headquartered in Singapore, we originate, finance, develop and deliver hyperscale data centres and associated decarbonized energy assets across Asia Pacific, end to end, from site to operations.

We work exclusively under a pre-contracted model, securing long-term offtake agreements with Tier-1 cloud service providers before committing capital to construction. Every project ingredient (land, power, fibre, permitting, operator, offtake) is locked down before a shovel enters the ground.

Our Pillars

Develop

We originate sites across APAC, secure grid connections, land rights, fibre access and planning approvals, and anchor each project with a long-term offtake agreement from a Tier-1 cloud service provider — all before committing to construction. Land, power, fibre, permitting, offtake — locked before breaking ground.


Build

We deliver under a fully-wrapped EPC model in partnership with leading Tier-1 contractors and operators, maintaining an on-the-ground project delivery team at every site. DDSP manages the full construction lifecycle from design integration to commissioning and handover. Fixed-price EPC, Tier-1 operator partners, DDSP on-site delivery team.


Decarbonize

Decarbonized energy is not an afterthought at DDSP. It is an integrated design principle. Alongside every campus, we develop the energy infrastructure needed to provide customers with a clear, credible path to net zero: solar, battery storage, green PPAs and emerging carbon solutions. Solar, BESS, green PPAs, on-site generation, from from day one.


Key Highlights

Founded


APAC Team


GW Collective DC Execution Capacity


GW Development Pipeline


Campuses Under Construction


Our Markets

DDSP has an active presence across six Asia Pacific markets

  • Taipei, Taiwan: under construction
  • Johor, Malaysia: under construction
  • Bangkok, Thailand: under development
  • Singapore: under development
  • Jakarta, Indonesia: under development
  • Pipeline (Japan, Australia)

Our Approach

DDSP’s Ready-to-Build model systematically eliminates binary risk before significant capital is deployed. Every project ingredient is contractually secured at each stage before moving to the next.

Site Analysis

• Identify target markets with structural power & land supply • Assess grid connectivity and last-mile fibre access • Confirm zoning, flood risk and environmental compliance • Secure site exclusivity before incurring meaningful capex


Project Development

• Acquire land and secure title • Confirm utility connections: power, water, fibre • Lock down Tier-1 CSP offtake agreement • Appoint operator and EPC contractor • Obtain all construction permits


Construction

• Fixed-price, fully-wrapped EPC contract • DDSP on-site delivery team at every project • Independent technical advisor oversight • Phased delivery aligned to offtake commencement • Energy infrastructure developed in parallel


Long-Term Operation

• Operations delivered with Tier-1 operator partners • DDSP asset management throughout lease term • 10–15 year offtake agreements with extension options • Capital stack optimised: refinancing and recapitalization pathways